Conducting the Surveying work for more than 900 hectares for Petro China Oil company, the land preparation included leveling and the construction of temporary and permanent streets with trenches for their new Camp.

Conducting the Surveying work for more than 900 hectares for Petro China Oil company, the land preparation included leveling and the construction of temporary and permanent streets with trenches for their new Camp.

Surveying works to locate points and elevation for topographical maps of the Umm Al-Qura Mosque project site in Baghdad, the Beneficiary was the Iraqi Ministry of Defense and this project was one of the longest that the AMCO- Iraq implemented.

The work of casting and the implementation of hydraulic dumper with hoper and then mounting the hydraulic dumper with all hydraulic and electromechanical, civil, , construction and sun shades, the project led to save and provide more than 400 million dinars annually as acts to ensure loading and unloading and in a systematic and very fast way.